Ghani Dairies Installs 600 kW Solar Power System to Cut Energy Costs

New-Project265

KARACHI: Ghani Dairies Limited (GDL) has installed a 600-kilowatt (kW) solar power system at its dairy farm in Khushab district as part of its ongoing Solar Expansion Project, aiming to reduce energy costs and reliance on conventional power sources.

The company disclosed the development in a notice to the Pakistan Stock Exchange (PSX) on Thursday, stating that the newly installed system is expected to substantially lower electricity expenses, improve operational efficiency and support more sustainable dairy farming operations.

No financial details regarding the solar project were disclosed.

Ghani Dairies Limited is a corporate dairy farming company engaged in the production of raw milk. Established in 2020 and converted into a public limited company in 2025, it operates from Rahdari, Noor Pur Thal, in Khushab district under the Ghani Group, which was founded in 1959.

The company operates a large-scale dairy farm with a herd of approximately 4,500 cattle, including high-yielding milking animals. Its operations include automated milking systems and climate-controlled sheds.

The installation reflects the growing adoption of renewable energy solutions by Pakistani businesses seeking to manage rising electricity and fuel costs, improve operational efficiency and reduce their environmental footprint.

Several other companies have also invested in solar power to meet their energy requirements. Panther Tyres Limited recently commissioned a 2.5-megawatt (MW) solar power system at its manufacturing facility, while Dewan Cement Limited commissioned a 6 MW solar power system at its Karachi manufacturing plant.

The increasing deployment of industrial and commercial solar systems highlights the growing role of renewable energy in reducing operating costs and strengthening energy sustainability across Pakistan’s industrial and agricultural sectors.

Related posts